Stop, rollback, and maintain

Use scope boundaries, diffs, checks, health evidence, and save points to decide when to ship, pause, reverse, or update.

Requires: A definition of done, current evidence, a known save point, and an owner for the next decision.

Done when: The team makes and records one justified decision—ship, pause, rollback, or continue—with a recovery point and future maintenance trigger.

Step 0 — Check the ground

Stop adding polish. Restate the approved scope, reviewed commit, open failures, and production health. If no save point is known, create or identify one before more change.

Steps

  1. Compare the current result with the PRD/brief acceptance criteria and non-goals.
  2. Inspect the diff from the last approved save point. Separate required changes, discovered bugs, and optional improvements.
  3. Review evidence: build, automated checks, browser path, permissions, production health, and human acceptance.
  4. Choose:
    • Ship: all release blockers pass and accepted limitations are recorded.
    • Pause: evidence or authority is missing; preserve state and questions.
    • Rollback: security, data, core workflow, or production health regressed.
    • Continue: a specific blocking criterion remains and the next small action is defined.
  5. For rollback, identify source commit and external/database state separately. Reverting source does not automatically reverse a migration or provider change.
  6. Record maintenance triggers: upstream starter change, runtime end-of-support, provider auth change, dependency alert, failing scheduled check, usage threshold, or content review date.
  7. Re-run the relevant baseline after any maintenance update before adopting it.
Context: Read the approved scope, reviewed commit, diff from the last save
point, eval results, deployment/health evidence, and open issues. Do not change
or deploy anything.

Recommend ship, pause, rollback, or continue. Map every blocking criterion to
evidence. Separate source rollback from database and external-system recovery.
For continue, propose one smallest next action. For ship, list accepted
limitations and maintenance triggers. Do not recommend more polish without a
requirement.

Approval gate

The product owner accepts scope and limitations. The technical/data owner approves rollback or migration recovery. The deployment owner approves a production change. A security/ownership failure is not waived as visual debt.

Verify

  • The decision references one commit/configuration and current evidence.
  • Every blocker has an owner or forces pause/rollback.
  • Rollback steps cover code, data, configuration, and external systems that changed.
  • The last known-good result is identifiable and testable.
  • Maintenance has a trigger and owner, not a vague promise.

Save point

Record the decision in the milestone/release review. For a pause, commit or stash only understood work and write exact resume steps. For ship, record the deployed commit. For rollback, record both previous and restored states.

If this fails

  • The team cannot agree on done: return to the approved acceptance criteria; change scope only with the product owner.
  • No clean rollback exists: reduce blast radius, back up data, and seek qualified review before another production action.
  • Upstream moved: compare it with the pinned tested baseline; do not update merely because main is newer.
  • A session is ending mid-task: leave a checkpoint with branch/commit, changed files, checks, blockers, and next command—not only a chat summary.